A good quote wins the job and stops the argument later. Here is what goes on one, line by line, and how to get it out before you have left the drive.
20 November 2026 · 6 min read
A quote for a job needs your business details, the customer’s name and address, a clear description of the work, an itemised price with VAT shown, how long the price stands and when you expect to be paid. Write the scope tightly enough that the customer knows exactly what they are getting, and what they are not. Then send it while the visit is still fresh in their mind: the first clear quote to land often wins.
Put your business name, phone number and address at the top, then a quote number and the date. Add the customer’s name and the job address. Describe the work in plain words, broken into lines: labour, then each main material or stage. Show the subtotal, the VAT (if you are registered) and the total. Finish with how long the quote is valid for, your payment terms and any deposit you need. If you have not worked out the price yet, start with how to price a job.
Most disputes start with a vague line such as “bathroom refit”. Spell out what that means: remove the old suite, first fix, fit the new suite, tile to full height on two walls. Then list what is not included, such as plastering, decorating, skip hire or moving the radiator. If something depends on what you find, say so: “price assumes floor joists are sound”. That one sentence saves a lot of awkward phone calls.
A quote is normally a fixed price for the work described. An estimate is your best guess and can move. Use the right word and say it on the page, because the customer will hold you to it. Our guide to whether a quote is legally binding explains the difference, and terms and conditions for quotes covers the small print worth adding.
If you are VAT registered, show your VAT number and make it obvious whether prices include VAT: homeowners compare totals, so a price “plus VAT” can look cheaper than it is. If you are not registered, do not add VAT. Say how long the price stands, for example 30 days, so you are not stuck with it when material prices rise. State when payment is due and how to pay. If you take a deposit, put the amount and what it covers on the quote.
A quote that arrives three days later is competing with two others. With GraftG you text the job on WhatsApp, something like “Quote for John Smith, fit new bathroom, 3 days labour, £250 tiles, £80 fixtures”, and a PDF quote comes back in seconds with a quote number, VAT, totals, your payment terms and a 30-day validity. Labour is priced from your hourly rate. When the customer says yes, reply ACCEPT and the quote number to turn it into an invoice. See how quotes work or the WhatsApp quote builder.
Your business details, a quote number and date, the customer and job address, a clear description of the work, itemised prices, VAT if you are registered, the total, how long the quote is valid for and your payment terms.
Many tradies use 30 days. Pick a period that suits how fast your material prices move, and always write it on the quote.
Usually, yes. Splitting labour and the main materials makes the price easier to trust and makes it clear what changes if the customer adds or removes something.
Keep reading
Solo from £14/month — 14-day free trial. No app to install.